Northern California Data Center
TRES Northern California Data Center is a former MCI Worldcom data center that was purchased by TRES and modernized by the TRES team with state of the art finishes to provide a new state of the art facility. The modernization included all interior finishes, new roof, all new electrical infrastructure(UPS/PDU/Switchgear) and an exhaustive renovation of the mechanical system. Final commissioning of the plant was performed by Lee Technologies.
-
-
East Portion of Data Center
East portion of the data center.
-
-
Interior of Data Center
Photo of one of the 3 sections of the building following the complete renovation of the center. All raised floor components including pdu, crac units configured for 100 watts per square foot critical load.
-
new building entrance.jpg
New Building entrance with ADA complaint ramps
-
New Building Lobby with Mantrap
New Building lobby with mantrap and security station.
-
Restrooms and common areas
All common areas renovated including new restrooms to ada compliance, new office finishes and entirely new entrance meeting all ada requirements.
-
Chiller Plant
Chiller plant completely upgraded with new digital controls and building automation system.
-
N+1 Swamp cooler for Chilled Water Plant
N+1 condensor plant with new pumps and newly installed digital automation.
-
Condenser Water Plant
N+1 Condenser Water Plant provides second source of cooling to the Building.
-
Mechanical Plant
Mechanical plant completely modernized to include new pumps, renovation of all major systems and installation of building automation system.
-
Roof mounted DX system
The third source of cooling is a roof mounted DX system. New 20 year roof installed at commencement of renovation.
-
New Generator Plant
Newly installed generator plant with N+1 capability.
-
Critical power generators
New mechanical plant generator system installed with N+1 capacity. Existing critical plant generators upgraded with Cummins Power Command digital automation.
-
New Fuel Farm
Photo of the New Fuel tanks being installed at the building.
-
New siemens fire control system
New addressable fire control system newly installed with all new panels and wiring throught the building.
-
N+1 Emerson ups system
6 new Emerson UPS units installed with complete new wiring to the new IEM switchgear.
-
Critical switchgear with digital controls
Switchgear in the critical side and mechanical plant upgraded and new intelligent PLC.
-
New battery system.jpg
All new batteries and racking supplied and installed by Liebert.