View all Projects > Carrier Center Los Angeles- Downtown Los Angeles Premier Carrier Hotel
-
Complete new building entrance
Former Robinsons Department store completely changed to state of the art building.
-
Building Entrance
Renovated by Johnson Fain, the building has outstanding new ground floor finishes.
-
Complete new elevator lobbies
All escalators removed and new elevators installed.
-
Complete systems to each tenant
Each tenant is supplied condensor water from the building main plant.
-
Renundant Condensor Water
Redundant condensor water system installed to reduce tenant's first cost of construction.
-
50,000 amps of 480 volt power installed
TRES coordinated one of the largest installations of power in downtown LA. Installed by the LA department of water and power- the systems were negotiated and installed in less than 15 months.
-
Power brought to the floor
TRES brought the power to the floor with an extensive bus system.
-
Largest Generator Plant in Downtown LA
TRES installed 15- 1500 KW generators with an extensive noise and pollution abatement program. Installed over 80,000 gallons of fuel for over 48 hours of run time.
-
Remote Radiator Farm
TRES installed a remote radiator farm to bring cooling and noise supression to the underground generator plant.
-
Communications Conduit to the Floor
TRES installed miles of conduit from redundant entrances to the central MeetmeRoom and each tenant area.
-
Entrance Facilities
Never enough entrance facilities- TRES installed 48 fiber entrances redundantly.
-
Central Condensor Water Plant
For the convenience of the tenants- a central condensor water plant was installed on the roof.
-
Makeup Water
TRES installed major plant for makeup water for the condenser plant.